01 · Project Services

Design & Planning

Design, planning and BC(A)R certification for extensions, new builds and retention applications — from first sketch to final certificate.

Design

From first sketch to construction drawings

Every project starts with a site visit and a conversation about how you want to live. Concepts are developed in 3D so you can see the design before it goes to planning, then carried through to tender and working drawings with a full performance specification.

D10

Architectural Design

Concept sketches through to construction drawings for extensions, renovations and new-build homes.

D20

Sketch Design & Feasibility

Outline proposals that test what a site or an existing house can take before you commit to a full design.

D30

Tender & Working Drawings

Detailed drawings and a performance specification so builders price the same job and build it right.

New dwelling under construction at Julianstown, Co. Meath
New dwelling · Julianstown
New dwelling at Collon, Co. Louth

Planning

Planning permission & retention permission

Applications prepared, lodged and managed with the local authority on your behalf — including further information requests.

P10

Planning Permission

Applications prepared, lodged and managed through the local authority process on your behalf.

P20

Retention Planning

Regularising work already built without permission, including the preparation of detailed drawings from existing conditions on site.

P30

Submissions on Planning Applications

Preparing observations and submissions on applications that affect your property.

P40

Planning Searches

Checking the full planning history of a site before you buy, carried out in person at the offices of the Local Authority.

Certification

Inspected, certified, signed off

Statutory BC(A)R roles and lender stage payments, handled by the same Registered Building Surveyor who knows the design.

C10

Design Certifier & Assigned Certifier

Certifying that the design complies with the Building Regulations, then coordinating inspections and signing the Certificate of Compliance on Completion.

C20

Stage Payment Certification

Inspections and certificates at each build stage so your lender releases funds on time.

C30

Inspection & Certification

Periodic site inspections during construction, with certification issued on completion.

New dwelling at Donacarney Great, Co. Meath
New dwelling · Donacarney

BIM & 3D

Modelled, not just drawn

Projects are developed as 3D BIM models — so drawings, schedules and the specification stay in step.

B10

3D Conceptual Design

See massing, light and finishes before planning.

B20

Scan to BIM

Laser scanning and modelling of existing conditions and facilities.

Recent work

New builds & extensions

Full portfolio

Planning & retention FAQ

Planning permission & retention permission in Louth & Meath

Do I need planning permission for an extension?

Many single-storey rear extensions to a house are exempted development up to 40 m² (including any earlier extensions), subject to conditions on height, the garden space left and distance from boundaries. Anything larger, to the front or side, or two-storey close to a boundary usually needs planning permission. We check your plans against the exemptions before you spend money on drawings.

What is retention permission?

Retention permission is planning permission applied for after the work has been done — where an extension, garage, conversion or other work was built without permission or does not match the permission granted. It often comes up when a property is being sold and the buyer’s solicitor asks for it. We survey the works, prepare the drawings and notices, and lodge the retention application with the council.

How long does planning permission take?

The council normally makes a decision within about eight weeks of a valid application. If further information is requested, the clock stops until the reply is lodged. After a decision to grant there is a four-week appeal period before the final grant issues.

Do I need a newspaper notice and a site notice?

Yes. A planning or retention application must be advertised in an approved local newspaper and on a site notice on the property in the two weeks before it is lodged. We prepare both and tell you exactly where and when to put up the site notice.

Which councils and areas do you cover?

Louth County Council and Meath County Council, including Drogheda, Ardee, Dundalk, Dunleer, Slane, Navan and the towns within 30 km of the office in Collon.

Fixed quote · usually same day

Planning an extension or a new home?

Send the site address and a short description and we will come back with a fixed fee proposal.